meta data for this page
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
sector:ippu:bulk_products:handling_of_bulk_products:start [2021/04/14 08:05] – kotzulla | sector:ippu:bulk_products:handling_of_bulk_products:start [2022/09/22 11:46] (current) – Fix links tarakji | ||
---|---|---|---|
Line 19: | Line 19: | ||
Here, for all years until 2009, the collection of data for transported goods followed the official **NST/R** (1968) **nomenclature and regulation** (Eurostat, 2015a) [(EUROSTAT2015a)]. | Here, for all years until 2009, the collection of data for transported goods followed the official **NST/R** (1968) **nomenclature and regulation** (Eurostat, 2015a) [(EUROSTAT2015a)]. | ||
- | As of 2010, statistical data following the newly implemented **NST-2007** [(EUROSTAT2015b)], | + | As of 2010, statistical data following the newly implemented **NST-2007** [(EUROSTAT2015b)], |
__Table 1: Overview of primary activity data sources over time__ | __Table 1: Overview of primary activity data sources over time__ | ||
Line 126: | Line 126: | ||
=== Emission factors === | === Emission factors === | ||
- | Emission factors are based on the methodology according VDI guidelines 3790. The values used here originate from a research project by (Müller-BBM, | + | Emission factors are based on the methodology according VDI guidelines 3790. The values used here originate from a research project by (Müller-BBM, |
Within the study, PM emission factors are estimated for each material or good that might be transported as dry and unpacked bulk. These very specific EF are than assigned to the classes of materials/ | Within the study, PM emission factors are estimated for each material or good that might be transported as dry and unpacked bulk. These very specific EF are than assigned to the classes of materials/ | ||
Line 208: | Line 208: | ||
Although no specific improvement is planned, additional effort will be necessary to further minimise the inconsistencies in the activity data time series resulting from the different approaches applied. | Although no specific improvement is planned, additional effort will be necessary to further minimise the inconsistencies in the activity data time series resulting from the different approaches applied. | ||
+ | |||
[(MÜLLERBBM2011> | [(MÜLLERBBM2011> | ||
- | [(EUROSTAT2015a> | + | [(EUROSTAT2015a> |
- | [(EUROSTAT2015b> | + | [(EUROSTAT2015b> |
[(DESTATIS2013> | [(DESTATIS2013> |