meta data for this page
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
sector:ippu:mineral_industry:construction_demolition:start [2024/03/13 14:00] – [Methodology] kludt | sector:ippu:mineral_industry:construction_demolition:start [2024/11/06 13:54] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 3: | Line 3: | ||
===== Short description ===== | ===== Short description ===== | ||
- | ^ Category Code ^ Method | + | ^ Category Code ^ Method |
- | | 2.A.5.b | + | | 2.A.5.b |
- | | {{page> | + | | {{page> |
+ | |||
+ | ---- | ||
| NO< | | NO< | ||
Line 17: | Line 19: | ||
===== Methodology ===== | ===== Methodology ===== | ||
- | Since the last update of the UNECE Guidebook, a Tier 1 method is applied to estimate particulate matter emissions. | + | Since the last update of the UNECE Guidebook, a Tier 1 method is applied to estimate particulate matter emissions. The T1 GB method is used by us with various adaptations to national conditions, so this is already higher tier, perhaps as T1/T2. |
The approach for uncontrolled fugitive emissions for this source category was adapted for national circumstances within a research Project (Umweltbundesamt, | The approach for uncontrolled fugitive emissions for this source category was adapted for national circumstances within a research Project (Umweltbundesamt, | ||
Line 60: | Line 62: | ||
[{{: | [{{: | ||
+ | |||
+ | Notes to PCB emissions of old buildings are given in chapter [[sector: | ||
===== Recalculations ===== | ===== Recalculations ===== |