meta data for this page
Differences
This shows you the differences between two versions of the page.
sector:waste:biological_treatment_solid_waste_disposal:start [2021/01/25 14:01] – schiller | sector:waste:biological_treatment_solid_waste_disposal:start [2024/11/06 13:54] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 2: | Line 2: | ||
===== Short description ===== | ===== Short description ===== | ||
- | ^ NFR-Code | ||
- | | 5.A | Solid Waste Disposal On Land | T1 | NS | D | //no key category// | ||
+ | ^ Category Code ^ Method | ||
+ | | 5.A | T1 | NS | D | | ||
+ | | {{page> | ||
+ | |||
+ | ---- | ||
+ | |||
+ | | NO< | ||
+ | | NA | ||
+ | | {{page> | ||
In category **5.A**, __NMVOC and PM< | In category **5.A**, __NMVOC and PM< | ||
- | In the period since 1990 (and previously, to some extent), a number of legal provisions have been issued pertaining to Germany' | + | In the period since 1990 (and previously, to some extent), a number of legal provisions have been issued pertaining to Germany' |
In 2004, about 2000 landfills of relevance for this category were in operation in the Federal Republic of Germany.\\ | In 2004, about 2000 landfills of relevance for this category were in operation in the Federal Republic of Germany.\\ | ||
In June 2005, in keeping with new, stricter requirements under the Ordinance on Environmentally Compatible Storage of Waste from Human Settlements (Abfallablagerungsverordnung) and the Landfill Ordinance (Deponieverordnung), | In June 2005, in keeping with new, stricter requirements under the Ordinance on Environmentally Compatible Storage of Waste from Human Settlements (Abfallablagerungsverordnung) and the Landfill Ordinance (Deponieverordnung), | ||
- | Also, pursuant to regulations in force since June 2005, landfilling of biodegradable waste is no longer permitted - for conformance with pertinent requirements, | + | Also, pursuant to regulations in force since June 2005, landfilling of biodegradable waste is no longer permitted - for conformance with pertinent requirements, |
- | All these measures have had strong impact on the formation of NMVOC, PM< | + | All these measures have had strong impact on the formation of NMVOC, PM< |
- | ===== Methodolgy | + | ===== Methodology |
+ | For the estimation of NMVOC, Germany decided against the proposed EF of the EMEP/EEA Guidebook 2019, but instead for the Tier 1 approach of the US-EPA which is also reproduced there (Part B, 5.A, chap. 3.2.2, p. 5; [(EMEPEEA2019> | ||
- | For the estimation of NMVOC, Germany decided against the proposed EF of the EMEP/EEA Guidebook 2016, but instead for the Tier 1 approach of the US-EPA which is also reproduced there (Part B, 5.A, chap. 3.2.2, p. 5; ((EMEP/EEA, 2016: EMEP/EEA air pollutant emission inventory guidebook 2016, Copenhagen, 2016))). According to national experts in the field, the approach of the US-EPA is more likely to produce better data, because the ratio between NMVOC (1.3 %) and CH< | + | Emissions for PM< |
- | + | The EFs are multiplied with the total amount of solid waste (AD) treated in managed above-ground | |
- | Emissions for PM< | + | |
- | The EFs are multiplied with the total amount of solid waste (AD) treated in managed above-ground | + | |
**EM = AD * EF** | **EM = AD * EF** | ||
+ | |||
==== Activity data ==== | ==== Activity data ==== | ||
+ | Data from 1990 until 2005 are made available for the UBA by the National Statistical Agency by means of a direct data provision (Statistisches Bundesamt, January 2019; [(Statistisches Bundesamt, Data provision by Mail, 14.01.2019; Data are confidential; | ||
- | Data from 1990 until 2005 are made available for the UBA by the National Statistical Agency by means of a direct | + | From 2006 until today, official statistical |
- | From 2006 until today, Official statistical data (Statistisches Bundesamt, Fachserie 19, Reihe 1: Abfallentsorgung (Waste management), | + | The data are published on a yearly basis with an exception for the actual year of reporting. The activity data for the actual year of reporting are obtained, initially, by carrying the relevant data from the previous year forward, in unchanged form. In the following year, when the actual activity data for the given year becomes available, they replace the data that were carried forward. With regard to emissions from landfills, this procedure has only a very small impact on the total emissions in the relevant current report year. |
==== Emission factors ==== | ==== Emission factors ==== | ||
- | + | See Methodology. | |
- | See above under Methodology. | + | |
===== Uncertainties ===== | ===== Uncertainties ===== | ||
- | The AD from Statistisches Bundesamt usually have an uncertainty of ±3% whereas the uncertainties for the PMs and TSP emission factors, according to the EMEP/EEA Guidebook (Part B, 5.A, chap. 3.2.2, Table 3-1, p. 5), were estimated | + | The AD from Statistisches Bundesamt usually have an uncertainty of ±3% whereas the uncertainties for the PMs and TSP emission factors, according to the EMEP/EEA Guidebook (Part B, 5.A, chap. 3.2.2, Table 3-1, p. 5), were estimated |
+ | __Table 1: Uncertainty estimates of PM emission factors__ | ||
^ PM< | ^ PM< | ||
^ PM< | ^ PM< | ||
Line 47: | Line 55: | ||
Regular back-calculations are required annually for the previous year, since the waste statistics of the Federal Statistical Office are published with a one-year delay for the data on the quantities and compositions of waste deposited, so that the current reporting year must therefore be estimated. The estimate is replaced in the following year with the then current data.\\ | Regular back-calculations are required annually for the previous year, since the waste statistics of the Federal Statistical Office are published with a one-year delay for the data on the quantities and compositions of waste deposited, so that the current reporting year must therefore be estimated. The estimate is replaced in the following year with the then current data.\\ | ||
- | Since the recalculation required as a result is very small overall in each year, it will not be reported additionally here. | ||
- | In this year's reporting there was a need for correction in addition to the reasons described above. In the past, an incorrect CH4 content (41% instead of 45%) was expected for landfills in the landfill and decommissioning phase in 2016, which also has an impact in 2015 and 2017. In addition, there was a marginal calculation error in the summation of sewage sludge going to landfill. For the reasons given above, a recalculation was necessary (see following table). | ||
- | Recalculation: Methane | + | __Table 2: Revised 2021 PM and TSP emissions, |
- | ^ | + | | ^ PM< |
- | ^ CH< | + | ^ current submission |
- | | ::: | ::: ^ 2020 | + | ^ previous submission |
- | ^ NMVOC | + | |
- | | ::: | ::: | + | |
- | ^ PM< | + | |
- | | ::: | ::: ^ 2020 | + | |
- | ^ PM< | + | |
- | | ::: | ::: | + | |
- | ^ TSP | + | |
- | | ::: | ::: | + | |
+ | <WRAP center round info 60%> | ||
+ | For **pollutant-specific information on recalculated emission estimates for Base Year and for the current year, please see the recalculation tables following [[general: | ||
+ | </ | ||
- | ===== Planned improvements ===== | ||
+ | ===== Planned improvements ===== | ||
Currently no improvements are planned. | Currently no improvements are planned. | ||
\\ | \\ |