meta data for this page
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
sector:ippu:metal_production:other_metal_production:start [2021/04/14 21:58] – [Method] reichel | sector:ippu:metal_production:other_metal_production:start [2023/04/26 13:31] (current) – [Recalculations] reichel | ||
---|---|---|---|
Line 4: | Line 4: | ||
In source category //NFR C.7.c - Other Metal Production// | In source category //NFR C.7.c - Other Metal Production// | ||
- | ^ Category Code ^ Method | + | ^ Category Code ^ Method |
- | | 2.C.7.c | + | | 2.C.7.c |
- | ^ | + | ^ |
- | | 2.C.7.c | + | | Key Category: |
{{page> | {{page> | ||
Line 17: | Line 17: | ||
The yearly production figures were provided by the German association " | The yearly production figures were provided by the German association " | ||
- | The figures are based on an annual | + | The figures are based on annual |
=== Emission factors === | === Emission factors === | ||
- | The emission factor for TSP is determined on the basis of data supplied for the BREF FMP (Ferrous Metals Processing | + | The emission factor for TSP was determined on the basis of data supplied for the FMP (Ferrous Metals Processing) |
- | The split factors originate < | + | The split factors originate |
+ | |||
+ | As produced amounts are confidantial no emission factors could be published. | ||
===== Recalculations ===== | ===== Recalculations ===== | ||
- | |||
- | Recalculations back to 2010 were necessary due to updated activity data and emission factor for TSP. | ||
<WRAP center round info 60%> | <WRAP center round info 60%> | ||
- | For more information on recalculated emission estimates for Base Year and 2018, please see the pollutant specific recalculation tables following chapter [[general:recalculations:start | 8.1 - Recalculations]]. | + | With **activity data and emission factors remaining unrevised**, no recalculations |
</ | </ | ||
+ | |||
===== Planned improvements ===== | ===== Planned improvements ===== | ||
Line 40: | Line 41: | ||
**Lit. | **Lit. | ||
+ | **Lit. |