meta data for this page
  •  

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
Next revisionBoth sides next revision
sector:ippu:metal_production:zinc_production:start [2023/03/14 12:40] – [Table] kotzullasector:ippu:metal_production:zinc_production:start [2023/03/14 12:40] – [Recalculations] kotzulla
Line 35: Line 35:
  
 __Table 2: Tier 2 emission factors applied for secondary zinc production__ __Table 2: Tier 2 emission factors applied for secondary zinc production__
-^  Pollutant  ^  EF  ^  Unit  ^ +|                   ^  EF      ^  Unit  ^ 
-SO<sub>2</sub>   | 1.35   | kg/t  |  +SO<sub>2</sub>     1.35     kg/t  | 
-PM<sub>2.5</sub> | 0.0385 | kg/t  |  +PM<sub>2.5</sub>   0.0385   kg/t  | 
-PM<sub>10</sub>  | 0.0613 | kg/t  | +PM<sub>10</sub>    0.0613   kg/t  | 
-TSP  | 0.100  | kg/t |  +TSP                0.100    kg/t  
-As  | 0.03 | g/t | +As                 0.03     g/t   
-Cd  | 0.23 | g/t |  +Cd                 0.23     g/t   
-Hg  | 1.5 | mg/t |  +Hg                 1.5      mg/t  
-Pb  | 0.95 | g/t |  +Pb                 0.95     g/t   
-Zn  | 9 | g/t |  +Zn                        g/t   
-PCDD/F | 0.15  | µg/t |  +PCDD/            0.15     µg/t  
-PCB      | 1.0      | mg/t   |+PCB                1.0      mg/t  |
  
  
Line 54: Line 54:
  
 <WRAP center round info 60%> <WRAP center round info 60%>
-For more information on **recalculated emission estimates for Base Year and 2019**, please see the pollutant specific recalculation tables following chapter [[general:recalculations:start | 8.1 - Recalculations]].+For more information on **recalculated emission estimates for Base Year and 2020**, please see the pollutant specific recalculation tables following chapter [[general:recalculations:start | 8.1 - Recalculations]].
 </WRAP> </WRAP>