meta data for this page
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
sector:ippu:chemical_industry:carbide_production:start [2021/02/25 12:55] – [Short description] Key Category table added & updated: no changes gniffke | sector:ippu:chemical_industry:carbide_production:start [2022/03/22 08:03] (current) – [Recalculations] kotzulla | ||
---|---|---|---|
Line 3: | Line 3: | ||
===== Short description ===== | ===== Short description ===== | ||
- | ^ Category Code ^ Method | + | ^ Category Code ^ Method |
- | | 2.B.5 | T3 ||||| PS ||||| PS ||||| | + | | 2.B.5 | T3 |
- | ^ | + | ^ |
- | | 2.B.5 | - | - | - | - | - | - | - | - | - | - | + | | Key Category: |
+ | {{page> | ||
- | During the German Reunification period, calcium carbide production took place primarily | + | During the German Reunification period, |
- | According to the responsible specialised association within the VCI, no silicon carbide has been produced in Germany since 1993. Emissions from this sector | + | According to the responsible specialised association within the VCI, **no silicon carbide** has been produced in Germany since 1993. Emissions from this process |
- | ===== Methodology | + | ===== Method |
==== Activity data ==== | ==== Activity data ==== | ||
- | Since Germany has only one producer, the relevant data must be kept confidential. | + | Since Germany has only one producer, the relevant data must be kept confidential. |
==== Emission factors ==== | ==== Emission factors ==== | ||
- | In covered furnaces, producers collect all of the carbon monoxide produced | + | In covered furnaces, producers collect all the carbon monoxide produced |
The emission factor for TSP is provided by the producer and is also confidential. | The emission factor for TSP is provided by the producer and is also confidential. | ||
Line 27: | Line 28: | ||
===== Recalculations ===== | ===== Recalculations ===== | ||
- | Because of a technical mistake the EF of TSP, PM,,10,, and PM,,2.5,, are corrected for the year 2017. TSP-EF is changed from 0.036 to 0.034 kg/t. | + | No recalculation activities were necessary. |
<WRAP center round info 60%> | <WRAP center round info 60%> | ||
- | For pollutant-specific information on recalculated emission estimates for Base Year and 2018, please see the pollutant specific recalculation tables following [[general: | + | For **pollutant-specific information on recalculated emission estimates for Base Year and 2019**, please see the pollutant specific recalculation tables following [[general: |
</ | </ | ||
- | |||
===== Planned improvements ===== | ===== Planned improvements ===== | ||
- | At the moment, no category-specific improvements are planned. | + | No category-specific improvements are planned. |