meta data for this page
Differences
This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
sector:waste:domestic_and_commercial_wastewater_handling:start [2022/02/26 07:37] – schiller | sector:waste:domestic_and_commercial_wastewater_handling:start [2024/11/06 14:47] (current) – external edit 127.0.0.1 | ||
---|---|---|---|
Line 3: | Line 3: | ||
===== Short description ===== | ===== Short description ===== | ||
- | ^ Category Code ^ Method | + | ^ Category Code ^ Method |
- | | 5.D.1 | T1 ||||| NS | + | | 5.D.1 | T1 |
- | ^ | + | ^ |
- | | 5.D.1 | + | | Key Category: |
| | ||
\\ | \\ | ||
Line 15: | Line 15: | ||
Emissions reported under this category are calculated using the Tier 1 approach of the EMEP/EEA Guidebook 2019, where the emission factor (EF) is 15 mg/m³ wastewater (Part B, 5.D, chap. 3.2.2, Table 3-1, p. 7 [(EMEP/EEA, 2019: EMEP/EEA air pollutant emission inventory guidebook 2019, Copenhagen, 2019)]). This EF is multiplied with the total amount of wastewater (AD) treated in domestic and commercial wwt-plants, following the equation:\\ | Emissions reported under this category are calculated using the Tier 1 approach of the EMEP/EEA Guidebook 2019, where the emission factor (EF) is 15 mg/m³ wastewater (Part B, 5.D, chap. 3.2.2, Table 3-1, p. 7 [(EMEP/EEA, 2019: EMEP/EEA air pollutant emission inventory guidebook 2019, Copenhagen, 2019)]). This EF is multiplied with the total amount of wastewater (AD) treated in domestic and commercial wwt-plants, following the equation:\\ | ||
\\ | \\ | ||
+ | <WRAP center round info 25%> | ||
**Emissions < | **Emissions < | ||
+ | </ | ||
+ | |||
==== Activity data ==== | ==== Activity data ==== | ||
Line 28: | Line 31: | ||
===== Recalculations ===== | ===== Recalculations ===== | ||
- | Recalculations were not necessary | + | |
+ | Recalculations were not necessary. | ||
+ | |||
+ | <WRAP center round info 60%> | ||
+ | For **pollutant-specific information on recalculated emission estimates for Base Year and 2019**, please see the recalculation tables following [[general: | ||
+ | </ | ||
===== Planned improvements ===== | ===== Planned improvements ===== | ||
Currently no improvements are planned. | Currently no improvements are planned. | ||
+ | \\ | ||
+ | \\ | ||
+ | \\ |